The background map did not load. Lines, sites and popups still work.
Ground Floor Energy
NY 5 MW Battery Site Search
Distribution lines where a 5 MW battery can both charge and discharge, at 10 kV and up, with land nearby. Utility data pulled 2026-09-14.
Top 10 sites
One site per line and per town. Click a site to fly to it.
Qualifying lines
Battery capacity = the lower of charge and discharge hosting capacity on each line section.
Utility
Candidate sites
Tax parcels of 1 acre or more within 300 ft of a qualifying line. Hollow rings are OpenStreetMap land-use areas in counties with no public parcels.
Local battery rules
GFE NY moratorium database v6, snapshot 2026-09-02. Sites in prohibited or moratorium towns are removed from the ranking.
Other layers
Base map
Sources